ERTO (Egis road & tunnel operation Ireland) is an Irish company and part of Egis Projects Ireland and the Egis Group.
The Jack Lynch Tunnel was built using the immersed tube method which involved the construction of a large casting basin on the South (Mahon) side of the river Lee. The excavation of one million tonnes of material was itself an unprecedented engineering challenge in Ireland.
Mitchelsfort Contracting provide a wide range of services to ERTO from the beginning of the project to present day works.
- Tunnel maintenance
- Repairs to passive fire protection panels
- Road repairs
- Repairs and maintenance to critical tunnel and road systems
- Install fibre optic cabling
- Install overheight vehicle system
- Roadside communication cabinets
- Infrastructure systems
- 15 space carpark construction, including car charging points, lighting, electrical systems, drainage, etc.